Tokushima: city in Japan
What exactly constitutes the spatial extent of the city? For these aggregations, we used the Global Human Settlement Layer Urban Center Database (GHS-UCDB) to define the boundaries of the city. These cities -- or urban centers -- cover areas that are densely populated and built-up, and so may extend beyond the spatial borders of these cities that we may be familiar with. The GHS area is shaded in blue.
View Tokushima, Japan on the sprawlmap
Most recent snapshot: Taking into account the entire (i.e. aggregate) street network in Tokushima as of 2014, the overall level of street-network sprawl is 2.02, which is relatively well-connected.
Trends in street network construction: The SNDis of street construction for the respective time periods are 2.03, 1.17, 2.13 and 2.63. The disconnectivity of new streets constructed in Tokushima fell, then rose. In 1976-1990, new street layouts were the most connected.
Quantity of street network construction: The street network in Tokushima spans a total of 4436 kilometers. It is dominated by roads constructed prior to 1975. These roads have an SNDi of 2.03, which is relatively well-connected.
Effect on the aggregate network: New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 2.03, 2.02, 2.02 and 2.02. The SNDi of the aggregate street network in fell at first, but Tokushima has worsened in disconnectivity since 2000.
Tokushima and Tokushima do not follow the same trend in the disconnectivity of their street network constructions. The SNDi in Tokushima was at its lowest in 1976-1990, while the SNDi of street constructions in Tokushima rose steadily.
How do development practices in Tokushima fare in comparison to others in Tokushima? Most recently in 2001-2014, street construction in Tokushima was the 1st-most disconnected out of the 1 cities in Tokushima. Its position in the ranks since 1975 has not changed. Tokushima ranked 1st in 1975, 1st in 1976-1990, 1st in 1991-2000 and 1st in 2001-2014.
Tokushima and Japan do not follow the same trend in the disconnectivity of their street network constructions. The SNDi in Tokushima was at its lowest in 1976-1990, while the SNDi of street constructions in Japan peaked in 1991-2000.
How do development practices in Tokushima fare in comparison to others in Japan? Most recently in 2001-2014, street construction in Tokushima was the 30th-most disconnected out of the 109 cities in Japan. Its position in the ranks since 1975 has fallen; relative to other cities in Japan, street construction in Tokushima has become more connected. Tokushima ranked 23rd in 1975, 73rd in 1976-1990, 56th in 1991-2000 and 30th in 2001-2014.
Tokushima and Tokushima do not follow the same trend in the disconnectivity of their aggregate street networks. The SNDi in Tokushima was at its lowest in 1991-2000, while the SNDi of street constructions in Tokushima rose steadily.
To date, Tokushima is the 1st-most disconnected out of the 1 cities in Tokushima. Its position in the ranks since 1975 has not changed. Tokushima ranked 1st in 1975, 1st in 1976-1990, 1st in 1991-2000 and 1st in 2001-2014.
Tokushima and Japan do not follow the same trend in the disconnectivity of their aggregate street networks. The SNDi in Tokushima was at its lowest in 1991-2000, while the SNDi of street constructions in Japan rose steadily.
To date, Tokushima is the 24th-most disconnected out of the 109 cities in Japan. Its position in the ranks since 1975 has fallen; relative to other cities in Japan, the street network in Tokushima has become more connected. Tokushima ranked 23rd in 1975, 26th in 1976-1990, 24th in 1991-2000 and 24th in 2001-2014.
As of 2015, Tokushima had a built-up area of 261.4 square kilometers, and a population of 469452 people.
These are some other cities with approximately the same population: