Trends

11.63

SNDi (2020)

69 km

Total street network

1975–2020

Analysis period

Disconnectedness burden of street construction in Hawrah

▸ Hover over bars to see values

SNDi
0
4
8
12
<1975
1976–1990
2006–2020

The chart above shows, for each construction period in Hawrah, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 1975 period contributed the greatest disconnectedness burden, with 46 km of street added at an SNDi of 14.32. Overall, the SNDi of new street additions followed a zig-zag trend with an overall decrease.

Most recent snapshot

Taking into account the entire (i.e. aggregate) street network in Hawrah as of 2020, the overall level of street-network sprawl is 11.63, which is very sprawly.

Trends in street network construction

The SNDis of street construction for the respective time periods are 14.32, 6.09, nan and 11.22. Data was not available in 1991-2005.

Quantity of street network construction

The street network in Hawrah spans a total of 69 kilometers. It is dominated by roads constructed prior to 1975. These roads have an SNDi of 14.32, which is very sprawly.

Effect on the aggregate network

New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 14.32, 11.7, 11.7 and 11.63. Overall, the SNDi of the aggregate street network has fallen: the street network in Hawrah has become more connected.