Trends
14.42
SNDi (2020)17 km
Total street network1975–2020
Analysis periodDisconnectedness burden of street construction in Habil al Jazi`
▸ Hover over bars to see values
The chart above shows, for each construction period in Habil al Jazi`, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 1975 period contributed the greatest disconnectedness burden, with 13 km of street added at an SNDi of 14.45. Overall, the SNDi of new street additions followed a zig-zag trend with an overall increase.
Most recent snapshot
Taking into account the entire (i.e. aggregate) street network in Habil al Jazi` as of 2020, the overall level of street-network sprawl is 14.42, which is very sprawly.
Trends in street network construction
The SNDis of street construction for the respective time periods are 14.45, 30.37, nan and 29.08. Data was not available in 1991-2005.
Quantity of street network construction
The street network in Habil al Jazi` spans a total of 17 kilometers. It is dominated by roads constructed prior to 1975. These roads have an SNDi of 14.45, which is very sprawly.
Effect on the aggregate network
New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 14.45, 14.46, 14.46 and 14.42. The aggregate street network in Habil al Jazi` increased in disconnectivity initially,but the trend has turned around after 1990.