Trends

2.63

SNDi (2020)

320 km

Total street network

1975–2020

Analysis period

Disconnectedness burden of street construction in Cheongan-dong

▸ Hover over bars to see values

SNDi
0
1
2
3
<1975
1976–1990
1991–2005
2006–2020

The chart above shows, for each construction period in Cheongan-dong, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 1991-2005 period contributed the greatest disconnectedness burden, with 190 km of street added at an SNDi of 2.26. Overall, the SNDi of new street additions followed a zig-zag trend with an overall increase.

Most recent snapshot

Taking into account the entire (i.e. aggregate) street network in Cheongan-dong as of 2020, the overall level of street-network sprawl is 2.63, which is relatively well-connected.

Trends in street network construction

The SNDis of street construction for the respective time periods are 2.43, 2.55, 2.26 and 3.86. Disconnectivity in street construction in Cheongan-dong follows a zig-zag trend. In 1991-2005, street construction was most disconnected, while construction was most connected in 2006-2020.

Quantity of street network construction

The street network in Cheongan-dong spans a total of 320 kilometers. It is dominated by roads constructed in 1991-2005. These roads have an SNDi of 2.26, which is well-connected.

Effect on the aggregate network

New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 2.43, 2.5, 2.31 and 2.63. Disconnectivity in Cheongan-dong's street network follows a zig-zag trend. In 1991-2005, the city was most disconnected; while it was most connected in 2006-2020.