Trends

4.72

SNDi (2020)

140 km

Total street network

1975–2020

Analysis period

Disconnectedness burden of street construction in Tokchon

▸ Hover over bars to see values

SNDi
0
1
2
3
4
5
<1975
1976–1990
1991–2005
2006–2020

The chart above shows, for each construction period in Tokchon, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 1976-1990 period contributed the greatest disconnectedness burden, with 40 km of street added at an SNDi of 5.09. Overall, the SNDi of new street additions peaked in 1976-1990.

Most recent snapshot

Taking into account the entire (i.e. aggregate) street network in Tokchon as of 2020, the overall level of street-network sprawl is 4.72, which is sprawly.

Trends in street network construction

The SNDis of street construction for the respective time periods are 4.71, 5.09, 4.71 and 4.37. Street construction in Tokchon increased in disconnectivity initially but has since improved. The streets constructed in 1976-1990 were the most disconnected.

Quantity of street network construction

The street network in Tokchon spans a total of 140 kilometers. The period with the greatest volume of street construction was 1976-1990. These roads have an SNDi of 5.09, which is very sprawly.

Effect on the aggregate network

New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 4.71, 4.91, 4.85 and 4.72. The aggregate street network in Tokchon increased in disconnectivity initially,but the trend has turned around after 1990.