Trends
3.72
SNDi (2020)46 km
Total street network1975–2020
Analysis periodDisconnectedness burden of street construction in Ifetedo
▸ Hover over bars to see values
The chart above shows, for each construction period in Ifetedo, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 2006-2020 period contributed the greatest disconnectedness burden, with 8 km of street added at an SNDi of 6.26. Overall, the SNDi of new street additions was at its lowest in 1976-1990.
Most recent snapshot
Taking into account the entire (i.e. aggregate) street network in Ifetedo as of 2020, the overall level of street-network sprawl is 3.72, which is relatively sprawly.
Trends in street network construction
The SNDis of street construction for the respective time periods are 2.69, 2.61, 4.88 and 6.26. The disconnectivity of new streets constructed in Ifetedo fell, then rose. In 1976-1990, new street layouts were the most connected.
Quantity of street network construction
The street network in Ifetedo spans a total of 46 kilometers. The period with the greatest volume of street construction was 1976-1990. These roads have an SNDi of 2.61, which is relatively well-connected.
Effect on the aggregate network
New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 2.69, 2.65, 3.15 and 3.72. The SNDi of the aggregate street network in fell at first, but Ifetedo has worsened in disconnectivity since 1990.