Trends
12.58
SNDi (2020)120 km
Total street network1975–2020
Analysis periodDisconnectedness burden of street construction in Mousani
▸ Hover over bars to see values
The chart above shows, for each construction period in Mousani, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 2006-2020 period contributed the greatest disconnectedness burden, with 87 km of street added at an SNDi of 11.95. Overall, the SNDi of new street additions peaked in 1976-1990.
Most recent snapshot
Taking into account the entire (i.e. aggregate) street network in Mousani as of 2020, the overall level of street-network sprawl is 12.58, which is very sprawly.
Trends in street network construction
The SNDis of street construction for the respective time periods are 8.77, 15.2, 13.42 and 11.95. Street construction in Mousani increased in disconnectivity initially but has since improved. The streets constructed in 1976-1990 were the most disconnected.
Quantity of street network construction
The street network in Mousani spans a total of 120 kilometers. It is dominated by roads constructed in 2006-2020. These roads have an SNDi of 11.95, which is very sprawly.
Effect on the aggregate network
New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 8.77, 14.11, 13.65 and 12.58. The aggregate street network in Mousani increased in disconnectivity initially,but the trend has turned around after 1990.