Trends

6.76

SNDi (2020)

21 km

Total street network

1975–2020

Analysis period

Disconnectedness burden of street construction in Mallikpratap

▸ Hover over bars to see values

SNDi
0
2
4
6
8
1976–1990
1991–2005

The chart above shows, for each construction period in Mallikpratap, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 1991-2005 period contributed the greatest disconnectedness burden, with 8 km of street added at an SNDi of 9.11. Overall, the SNDi of new street additions followed a zig-zag trend.

Most recent snapshot

Taking into account the entire (i.e. aggregate) street network in Mallikpratap as of 2020, the overall level of street-network sprawl is 6.76, which is very sprawly.

Trends in street network construction

The SNDis of street construction for the respective time periods are 8.96, 4.34, 9.11 and nan. Data was not available in 2006-2020.

Quantity of street network construction

The street network in Mallikpratap spans a total of 21 kilometers. It is dominated by roads constructed prior to 1975. These roads have an SNDi of 8.96, which is very sprawly.

Effect on the aggregate network

New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 8.96, 5.0, 6.76 and 6.76. Disconnectivity in Mallikpratap's street network follows a zig-zag trend. In 1976-1990, the city was most disconnected; while it was most connected in 1975.