Trends
4.0
SNDi (2020)55 km
Total street network1975–2020
Analysis periodDisconnectedness burden of street construction in Rajam
▸ Hover over bars to see values
The chart above shows, for each construction period in Rajam, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 1976-1990 period contributed the greatest disconnectedness burden, with 22 km of street added at an SNDi of 4.11. Overall, the SNDi of new street additions rose steadily.
Most recent snapshot
Taking into account the entire (i.e. aggregate) street network in Rajam as of 2020, the overall level of street-network sprawl is 4.0, which is sprawly.
Trends in street network construction
The SNDis of street construction for the respective time periods are 2.77, 4.11, 4.4 and 4.5. In each period, new street development in Rajam steadily grows more disconnected than in the last. This increase has slowed: between 1975 and 1976-1990, SNDi rose by 1.34 points, but between 1991-2005 and 2006-2020, it rose by just 0.1.
Quantity of street network construction
The street network in Rajam spans a total of 55 kilometers. The period with the greatest volume of street construction was 1976-1990. These roads have an SNDi of 4.11, which is sprawly.
Effect on the aggregate network
New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 2.77, 3.56, 3.95 and 4.0. Overall, the SNDi of the aggregate street network has risen: the street network in Rajam has become more disconnected. This increase has slowed: between 1975 and 1976-1990, SNDi rose by 0.78 points, but between 1991-2005 and 2006-2020, it rose by just 0.05.