Trends
2.87
SNDi (2020)170 km
Total street network1975–2020
Analysis periodDisconnectedness burden of street construction in Ipiales
▸ Hover over bars to see values
The chart above shows, for each construction period in Ipiales, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 1991-2005 period contributed the greatest disconnectedness burden, with 66 km of street added at an SNDi of 2.88. Overall, the SNDi of new street additions peaked in 1976-1990.
Most recent snapshot
Taking into account the entire (i.e. aggregate) street network in Ipiales as of 2020, the overall level of street-network sprawl is 2.87, which is moderately connected.
Trends in street network construction
The SNDis of street construction for the respective time periods are 2.51, 4.02, 2.88 and 2.61. Street construction in Ipiales increased in disconnectivity initially but has since improved. The streets constructed in 1976-1990 were the most disconnected.
Quantity of street network construction
The street network in Ipiales spans a total of 170 kilometers. It is dominated by roads constructed prior to 1975. These roads have an SNDi of 2.51, which is relatively well-connected.
Effect on the aggregate network
New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 2.51, 2.89, 2.88 and 2.87. The aggregate street network in Ipiales increased in disconnectivity initially,but the trend has turned around after 1990.