Trends
11.53
SNDi (2020)54 km
Total street network1975–2020
Analysis periodDisconnectedness burden of street construction in Sundarganj
▸ Hover over bars to see values
The chart above shows, for each construction period in Sundarganj, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 1976-1990 period contributed the greatest disconnectedness burden, with 21 km of street added at an SNDi of 11.64. Overall, the SNDi of new street additions followed a zig-zag trend with an overall increase.
Most recent snapshot
Taking into account the entire (i.e. aggregate) street network in Sundarganj as of 2020, the overall level of street-network sprawl is 11.53, which is very sprawly.
Trends in street network construction
The SNDis of street construction for the respective time periods are 9.59, 11.64, 10.85 and 12.53. Disconnectivity in street construction in Sundarganj follows a zig-zag trend. In 1975, street construction was most disconnected, while construction was most connected in 2006-2020.
Quantity of street network construction
The street network in Sundarganj spans a total of 54 kilometers. It is dominated by roads constructed in 1991-2005. These roads have an SNDi of 10.85, which is very sprawly.
Effect on the aggregate network
New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are 9.59, 11.25, 10.99 and 11.53. Disconnectivity in Sundarganj's street network follows a zig-zag trend. In 1975, the city was most disconnected; while it was most connected in 2006-2020.