Trends
10.6
SNDi (2020)24 km
Total street network1975–2020
Analysis periodDisconnectedness burden of street construction in Kumarkhali
▸ Hover over bars to see values
The chart above shows, for each construction period in Kumarkhali, the SNDi of new street additions (bar height) and the volume added (bar width), so that bar area reflects the total disconnectedness burden of that period's construction. The 1991-2005 period contributed the greatest disconnectedness burden, with 22 km of street added at an SNDi of 10.2. Overall, the SNDi of new street additions followed a zig-zag trend.
Most recent snapshot
Taking into account the entire (i.e. aggregate) street network in Kumarkhali as of 2020, the overall level of street-network sprawl is 10.6, which is very sprawly.
Trends in street network construction
The SNDis of street construction for the respective time periods are nan, 6.96, 10.2 and 16.43. Data was not available in 1975.
Quantity of street network construction
The street network in Kumarkhali spans a total of 24 kilometers. It is dominated by roads constructed prior to 1975. These roads have an SNDi of nan, which is very sprawly.
Effect on the aggregate network
New construction in each period adds to the total stock of streets, but does not change streets that have already been built. Therefore, it has a limited effect on the street network as a whole. The SNDis of the aggregate street network in the respective time periods are nan, 6.96, 9.43 and 10.6. Data was not available in 1975.